So, the total volume of concrete = Original Volume + Extra Volume = 1.23 + 0.122 = 1.35 cubic yard.Now we are adding 10% of extra volume because of dry volume and wastage of concrete.Volume of concrete = 33/27 = 1.22 cubic yard.After that, we divide 33 cubic feet by 27 to get the volume of concrete in the cubic yard.3 ft= 1 yard, 3ft x 3 ft x 3ft = 1 yard x 1 yard x 1 yard.Let’s consider 10′ x 10′ slab with thickness 4” The calculation of volume of slab is the multiplying of length, width and thickness. Method – 2 Step-1: Calculate Volume of Concrete Required Pouring 10 X 10 Slab Thickness 4 inch